Nagpur: Nagpur Metro Officials have minutely inspected the railway track of Maha Metro Project between MIHAN to Khapri Metro Station on Monday. The inspection was based on the technical ground and track has been found fit for commercial operations of the Metro.
#नागपूरमेट्रो चे यशस्वी ‘बुलंद’ परीक्षण ..
पहिल्या #ट्रायलरन करिता मिहान डेपो ते खापरी मेट्रो स्टेशन रूट तपासणीचा शेवटचा टप्पा काल पार पडला. pic.twitter.com/YQFNxhbuIb— Nagpur Metro Rail (@MetroRailNagpur) September 19, 2017
The Maha Metro is extensively working on the technical check of the railway track upto New Airport Station. Janak Kumar Garg, Senior CPM (rolling stock), Ravi Kumar, Additional CPM (track) and Senior Deputy General Manager Sai Sharan Dixit inspected the track with the help of inspection car.
The process of checking has been completed for the operation of Maha Metro from November on this track.
Check Out : Track laying completed as Nagpur Metro begins internal trial run.